Files
leetcode/AGENTS.md
T

133 lines
31 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Repository Guidelines
## Project Overview
LeetCode interview-prep campaign (2026-08-17 → Nov 3: eight weeks of topics, then the Review-issue phase; the end is the last date in `apps/api/data/schedule.json` — `CAMPAIGN_END`/`CAMPAIGN_DAYS` in `apps/api/src/srs.ts` are derived from it, never declared) run as a repo: solution files under `work/`, the docs content under `docs/` (MDX only — the Blume site that publishes it lives in [prdlk/cs](https://github.com/prdlk/cs) and reads `docs/` over HTTP), GitHub Actions that reconcile issues, and a Cloudflare Worker (`apps/api/`) that runs the spaced-repetition system (SRS) — daily digest email, one-tap logging, weekly review issues, live charts. Issues model the curriculum: ~24 `topic` issues (`Topic NN — Name`) own ~161 `problem` sub-issues titled `LC <num> · <Name>`, with difficulty and set carried **only** by labels (`set:core|optional|deferred`, `diff:*`) — never by the title; milestones are phases; a user-level GitHub Project ("Interview Prep", #2) mirrors review state.
## Architecture & Data Flow
Three owners, one direction of truth:
```mermaid
flowchart LR
work[work/ solutions] -->|bun run sync| docs[docs/*.mdx + docs/site.json]
docs -->|mdxRemote + site.json fetch| Site[prdlk/cs docs site]
work -->|close-solved.yml| PI[problem issues]
work -->|close-solved.yml POST /admin/solved| D1[(D1 = SRS state)]
PI -->|close-topics.yml| TI[topic + Review N issues]
PI -->|close-solved.yml release job| Rel[timever release per finished topic / Review N]
GH[GitHub issues = catalog] -->|nightly reconcile| D1
D1 -->|8 AM ET cron| Mail[digest email + one-tap links]
Mail -->|GET /log| D1
PI -->|/done webhook| D1
D1 -->|best-effort mirror: Target Date only| Proj[GitHub Project fields]
GH -->|close-solved.yml sync-project-fields| Proj
D1 -->|Sat midnight ET| Review[Review — Week N issue]
PI -->|"spaced-repetition.yml (6 AM ET cron, closed +3d/+7d)"| SR[Spaced Repetition — Month D issue]
D1 --> Charts[SVG charts + /api/stats]
Charts -->|bun run stats| TUI[terminal dashboard]
```
- **Reconcile, don't react.** `close-solved.ts`, `close-topics.ts`, and the Worker's catalog sync recompute desired state from scratch each run: re-runs are no-ops, backfills need no special casing, closing is one-directional. `close-solved` posts its *whole* implemented set to `/admin/solved`, not just the issues it closed this run.
- **Solving has three doors, one write path.** A digest one-tap, a `/done` comment, and a solution landing in `work/` all end in `logAttempt()`. Closing an issue is *not* one of them: the catalog reconcile never reads issue state, so a `work/` push that skipped the email would otherwise leave `stage='new'` — invisible to the charts, the digest's solved ticks, and the drill/gate pools. Hence `/admin/solved`, which takes `{lc, bucket}` pairs (`source='commit'`): the bucket names the rung the file settles — `work/1` settles `new`, `work/3` settles `+3`, `work/7` settles `+7` — so a pushed re-solve advances the ladder instead of vanishing, and re-posting the whole implemented set writes nothing because the rung named has already been left behind. That stage check is the entire idempotency mechanism; no index, no dedupe table, no state file. `close-topics` needs no such call — D1 stores no topic completion, only problem rows.
- **The rest day is structural, not cosmetic.** Sunday is never booked: topics run Mon–Fri (`apps/api/data/schedule.json`), the gate is Saturday, and the ladder's windows are 3 and 7 precisely because those return a solve to a working day. Every scheduled date — ladder review, levelled overflow, deferred-Hard release, review-issue window — comes out of `workingDay()` in `apps/api/src/srs.ts`, which slides the one exception (a Thursday solve's `+3`) forward to Monday. Forward, never back: a review may slip later than its interval, never shorten it. Never mint a scheduled date with bare `addDays()`, and never "fix" a Sunday landing downstream — the digest's Sunday rest branch is a courtesy, not the mechanism. `apps/api/src/srs.test.ts` sweeps the campaign calendar to keep this honest.
- **One schedule, one answer to "what is open today".** D1's ladder IS the schedule; `dueToday()` (`POST /admin/due`) is its read side and `DUE_WHERE` is the single SQL definition of "due", shared by the digest, the review issue and the docs queue chart. `spaced-repetition.yml` renders that answer into today's `Spaced Repetition — <Month D, YYYY>` issue — grouped by rung, `WINDOW_CAP` (3) required per rung with the overflow listed as optional, keyed by the ET date in the title so a re-run rewrites one body. It schedules nothing, stores nothing, and writes nothing on Sunday. Without `SRS_ADMIN_KEY` it FAILS rather than inventing a second schedule from issue close dates — that reconstruction was the drift, and it is gone. NEVER add a JSON state file (`.github/problems.json` and friends) or a second "when is this due" rule: D1 answers it, with one writer (`logAttempt`) and git-free history in `attempts`.
- **The picker owns the local review loop; the buckets are its state.** `work/` holds three buckets (`1` = first solve, `3`/`7` = blind re-solves, named after the ladder rungs) and `bun run pick` has three sections — Tab cycles them. Pools are reconciled from the filesystem plus one `git log` (`apps/cli/work.ts`): a first solve dates from the ET date of the commit that added its `work/1` file — the same push that closes the problem issue and starts the +3/+7 windows — and a window stops being owed the moment its bucket holds a file. Uncapped, unlike the review issue's `WINDOW_CAP`: that issue is one day's assignment, the picker is everything still owed. An empty scaffold under `work/1` owes nothing (it is unsolved), which is why `isImplemented()` lives in `apps/cli/source.ts` and is shared with `close-solved.ts`. leetcode-cli reads its output directory from `~/.leetcode/workspaces/<active>/config.json` and nowhere else — no flag, no env var — so `pick.ts` MERGES `workDir` into that file around the child (never replays saved bytes: the CLI owns the file too) and leaves it pointed at `work/1`, then treats the scaffold's existence as the acceptance test, since leetcode-cli exits 0 even when an expired session made it write nothing. The picker itself writes no state: pushing the re-solve is what moves the ladder, via `close-solved` → `/admin/solved` with that file's bucket.
- **The README charts are live, never committed.** They are Worker endpoints reading D1 per request (`Cache-Control: max-age=300`, honored by GitHub Camo), so a solved push moves them within ~5 minutes with no commit and no workflow of their own.
- **D1 owns SRS state; GitHub issues own the catalog; `apps/api/data/schedule.json` owns the calendar.** The catalog reconcile never invents rows and never overwrites SRS columns (`stage`, `next_review`). `Target Date` is the *only* Project field the Worker mirrors (`apps/api/src/mirror.ts`): failures are warnings, never lost D1 writes; topic rows' `Target Date` is never written. SRS stage and first-attempt result live **only** in D1 — do not re-add them as Project fields. The Project's `Set`/`Difficulty` single-selects are a projection of the issue labels, reconciled by `bun run sync-project-fields` — a best-effort final step of `close-solved.yml`, never the Worker.
- **The plan names days; the samplers fill the gaps.** `apps/api/data/schedule.json` maps a date to a `ScheduledDay` (`apps/api/src/srs.ts`): `topics` (one or more topic issues — a doubled day lists two, and the digest renders each with its core list then the optional "if time" list), `problems` (a set day: fixed numbers, rendered like a topic), `gate` (Saturday's blind set, verbatim — `createReviewIssue` refuses to create the issue if any number is not a catalog row, so gate problems must exist as `set:optional` sub-issues of their topic first), or `sweep` (every problem whose last attempt failed, taps to re-log, no drills). Every number a `gate` or `problems` entry names is in `RESERVED`, and the drill/gate samplers never draw it — that is what keeps a planned gate problem unseen until its Saturday. Dates absent from the plan still get the ladder's reviews and drills; a Saturday without a `gate` entry falls back to sampling this week's optional pools.
- **Determinism = idempotency.** Drill/gate sampling uses a seeded PRNG (`rng()` in `apps/api/src/srs.ts`, FNV-1a → mulberry32, seed = date / ISO week); the digest is keyed by ET date in `email_log`; one-tap links are unique on (problem, date, kind).
- **DST-proof crons:** each event has two UTC crons; code fires only on the computed ET hour (`etHour`), unit-checked in `apps/api/src/srs.test.ts`.
- **Chained workflows:** `GITHUB_TOKEN`-driven issue closes fire no `issues` events, so `close-topics.yml` chains off `workflow_run` of Close Solved instead. The Worker's webhook uses its own `GH_PAT`, so its events flow normally.
- **One "finished topic" rule, two consumers.** `apps/cli/topics.ts` (`coreSet()`: every `set:core` sub-issue closed, zero core = never) is read by `close-topics.ts` (closes the topic issue) and `release-topics.ts` (the `release` job of `close-solved.yml`). The release reads the sub-issues, not the topic issue, so the push that finishes a topic releases it in the same run instead of waiting for Close Topics to chain after it. Version = [timever](https://gist.github.com/twolfson/de1b004dd22536b8e668) (`YYYYMMDD.HHMMSS.NNNNNNNNN`, UTC) of the instant the last core problem closed; the tag is annotated and backdated to that instant, on the last first-parent main commit before it; the body is a changelog snapshot at that instant (a one-sentence summary first, then the problems closed on the finish day / earlier, with solution links at the tag — problems still open at the finish are left out). A release is found by its `<!-- release-topics: #N -->` body marker, never by tag name, so re-closing a core problem never mints a second one; an existing release keeps its tag and has its name (the topic title) and body rewritten whenever the render changes. The docs site's `/changelog` (prdlk/cs `pages/changelog.astro` + `lib/releases.ts`) fetches this repo's releases at its build, dates each by its timever tag, not `published_at` (which the API cannot backdate), tags it `Topic` or `Review` from the release name, and lists the rows of its `### Closed …` tables — so the tag format and that table shape are its cross-repo contract with `render()`.
- **Review issues re-parent problems; topics still own them.** The transfer phase's 20 `Review <N> — <Phase>` issues (label `review`, milestone `Review — Transfer & Mocks`; not the Worker's `Review — Week N` gate issues) hold open optional/deferred problems as sub-issues in solve order, moved there with `replace_parent`. `apps/api/src/reviews.ts` is the ONE recovery of ownership — `readReviews()` (one GraphQL request per 50 `review` issues, cheap enough for the Worker's cron subrequest budget) reads each moved problem's topic off its last `parent_issue_removed` event naming a topic, `movedFromTopics()` groups them — shared by the Worker's catalog reconcile (a moved problem's D1 row keeps syncing its labels and `topic_issue`) and `apps/cli/topics.ts` (`readProblems()` returns a topic's sub-issues plus its moved problems, so the finished rule and existing release bodies do not change when a problem moves). A Review issue finishes by `completion()` in `topics.ts` — every sub-issue closed, any set — which `close-topics.ts` closes it on and `release-topics.ts` releases it on, exactly like a topic: timever of the last close, same `<!-- release-topics: #N -->` marker (issue numbers never collide), body fields from the review's `**Scheduled:**`/`**Phase:**`/`**Load:**` lines.
- **Review days are plan days.** `schedule.json` books each Review issue on its own date — Mon/Tue/Thu/Fri only, Oct 1 → Nov 3 — as `review: { issue, title, problems }` (solve order). The digest renders it as a linked "Today's review" section with the issue's day rules (`REVIEW_RULES` in `email.tsx`, one sentence for HTML and text), its problems join `RESERVED` so drills and sampled gates never draw them early, and `gate: []` skips a Saturday's checkpoint (Oct 3). The issue's sub-issues stay the truth: the catalog reconcile compares every booked review's title and problem list with GitHub and returns any mismatch as `reviewDrift` (also logged), so a re-arranged Review issue shows up the next sync instead of silently disagreeing with the email. Move a review by editing its `schedule.json` date AND the issue's `**Scheduled:**` line (the release body reads it).
## Key Directories
| Path | Purpose |
|---|---|
| `work/<1\|3\|7>/<Difficulty>/<Category>/<num>.<slug>.{js,py}` | Solutions, e.g. `work/1/Easy/Array/1.two-sum.py`. The top directory is the spaced-repetition bucket: `1` = first solve, `3`/`7` = the blind re-solves of that problem 3 and 7 days later. Machine-parsed header comment (title / `Difficulty:` / URL / `─` rule / statement) — preserve its exact shape |
| `apps/cli/` | Flat Bun TS workspace: automation entries (shebang + top-level await) and libraries (no shebang, side-effect-free on import). Root `bun run` scripts delegate here |
| `docs/` | The docs content, and nothing of the site: no `blume.config.ts`, no `meta.ts`, no components. prdlk/cs publishes it with Blume's `mdxRemote()` source, which fetches `.md`/`.mdx` files only. `docs/(0N-<phase>)/<topic>/(problems)/<num>_<slug>.mdx` is generated by sync; `(0N-<phase>)/<topic>/index.mdx` (`hidden: true`) is a topic's hand-written landing page, and `index.mdx`/`keywords.mdx`/`progress.mdx` sit at the root. The phase folder is a `(group)` (sidebar section, no route segment), the topic folder is the README campaign topic slug (`tree-dfs/`, `heap-priority-queue/`) and a real route segment, and `(problems)` is a second `(group)` inside it, so `tree-dfs/(problems)/226_invert-binary-tree.mdx` routes to `/tree-dfs/invert-binary-tree` (Blume sorts by the `<num>_` prefix and strips it from the route). `docs/site.json` is sync's generated manifest and the site's ONE other input: `folders` (path under `docs/` → `{ title, order, icon?, display? }`, exactly what a `meta.ts` in that folder would say — every topic `display: "page"`, so it is one sidebar row whose panel holds its landing page and a "Problems" section) and `redirects` (the `/<num>` short links). Images are root-absolute (`![](/topo_intro_1.png)`, `<CarouselImage src='/binary_search.001.png' />`) and served from the site's `public/` — a page-relative path cannot resolve once the MDX is fetched over HTTP. Frontmatter keys beyond Blume's (`topics:`, `video:`, `issue:`) and the MDX components pages use (`<CodeGroup>`, `<Carousel>`/`<CarouselImage>`, the islands) are the site's to declare — add a new one there before a page uses it |
| `apps/api/` | Cloudflare Worker workspace: `src/` modules, `data/schedule.json` (the plan: `date → { topics | problems | review | gate | sweep }`, human-edited, bundled at deploy), `migrations/` (append-only; `0002` is the +3/+7 ladder rebuild) |
| `.github/workflows/` | deploy (Worker → Cloudflare with the `OPENROUTER_API_KEY` Actions secret put into it first, on every main push; the docs site deploys from prdlk/cs), close-solved (issues + `/admin/solved` + Project `Set`/`Difficulty`, needs `SRS_ADMIN_KEY` and `PROJECT_PAT`; then the `release` job: timever tag + release per finished topic, `contents: write`), close-topics, sync-d1 (issue edits → `/admin/reconcile`), spaced-repetition (daily 06:00 ET cron → today's review issue; `GITHUB_TOKEN` only, no secrets) |
| `.githooks/` | `bun install` points `core.hooksPath` here (root `prepare` script, no husky). Its `pre-commit` hook (run `bun run sync`, stage only what sync changed — pages and `docs/site.json`) was removed in `e63d517`, so nothing runs on commit today: run `bun run sync` yourself before committing a solution, or its page and short link ship a commit later |
## Development Commands
All from the repo root (a Bun workspace over `apps/*`):
```sh
bun run pick # scaffold a solution via leetcode-cli (fuzzy picker; Tab cycles the
# sections: new problems → work/1, then the owed 3-day and 7-day
# re-solves → work/3, work/7. Each section hides what its own bucket
# already holds; index+descriptions cached in
# ~/.local/share/leetcode/data.db — see apps/cli/db.ts)
bun run stats # terminal dashboard over GET /api/stats — four panes (Overview,
# Ladder, Concepts, Activity); Tab/1-4 switches, ↑↓ scrolls,
# r refetches, q quits. Outside a TTY it prints every pane once.
# SRS_API points it at a local Worker like close-solved does.
bun run test # run ONE solution against LeetCode's judge (not a test suite;
# most recently tested first, stamped in the db on exit 0)
bun run submit # submit ONE solution to LeetCode (newest scaffold first, nothing
# hidden; last_submitted stamped in the db on exit 0)
bun run sync # work/1 → docs/ pages + docs/site.json (folder meta + /<num> short
# links; re-solves are never published)
bun run videos # docs pages with no `video:` frontmatter → NeetCode video per page
# (channel search scraped, no API key; --write adds the
# `video:` key; "no NeetCode match" pages stay untouched)
bun run close-solved -- --dry-run # issue reconcilers (also DRY_RUN=1)
bun run close-topics -- --dry-run
bun run release-topics -- --dry-run # prints every would-be topic release body
# close-solved also pushes the solved set to the Worker; point it at a local
# one and nothing production is touched:
SRS_API=http://localhost:8787 SRS_ADMIN_KEY=$LINK_KEY bun run close-solved -- --dry-run
# Project Set/Difficulty from the issue labels (needs a `project`-scoped token;
# runs as the last step of close-solved.yml in CI):
GH_TOKEN=$PROJECT_PAT bun run sync-project-fields -- --dry-run
# today's review issue from the +3d/+7d closes (--date backfills a missed day;
# a Sunday date writes nothing — the rest day has no assignment):
bun run spaced-repetition -- --dry-run --date=2026-08-31
bun run api:dev # wrangler dev on :8787 (local D1)
bun run api:test # DST guards + the rest-day calendar sweep
bun run api:deploy # deploy the Worker by hand (CI also deploys on main pushes)
curl -X POST -H "Authorization: Bearer $LINK_KEY" \
"localhost:8787/admin/digest?dry=1&date=2026-08-30" # preview a digest, send nothing
```
## Code Conventions & Common Patterns
- **Scripts are either entries or libraries.** Entries (`apps/cli/close-*.ts`) use shebang + top-level `await`. Libraries (`apps/cli/github.ts`, `apps/cli/report.ts`, everything in `apps/api/src/`) are side-effect-free on import — nothing touches network/credentials until a factory (`github()`, `projectMirror()`) is called.
- **Shared plumbing:** `github()` gives `repo`, `api()` (throws `METHOD path -> status body`), `list()` (paginating async generator), `closeIssue()` (comment **first**, then close — a failed PATCH still leaves a trace). `report.ts` gives `printTable`/`markdownTable`/`writeStepSummary`.
- **Narrow API payloads with guards**, not inline casts: `if (!("number" in value) || typeof value.number !== "number") return;` (see `readProblemIssue` in `close-solved.ts`). Named-const casts only with a reason.
- **Dry-run everything:** reconcilers take `--dry-run`/`DRY_RUN=1`; Worker admin routes take `?dry=1&force=1&date=` (the `SRS_TODAY` equivalent) and `wrangler dev` runs against local D1 — exercise logic there before touching production state.
- **Dates:** always ET calendar strings (`YYYY-MM-DD`), arithmetic anchored at noon UTC (`atNoon` in `apps/api/src/srs.ts`) to dodge DST. Never `new Date()` math directly.
- **Style:** section-divider comments (`// ── name ───`), file-top doc comments explaining the *why* and invariants, 2-space JSON with trailing newline, `Map` for dynamic keys / `Record` for static tables, no tiny one-expression wrapper functions.
- **Known intentional duplication:** `sync.ts` keeps its own header split instead of sharing `apps/cli/source.ts`, because `sync.ts` runs its whole pipeline on import and so cannot be imported from. Don't "deduplicate" it. `close-solved.ts` and `work.ts` do share it — the stub test decides both "close the issue" and "owes a review", and the two must never disagree.
## Important Files
- `apps/api/src/srs.ts` — SRS domain: the ladder (`new → +3 → +7 → retired`; fail resets to `+3`; first-ever log enters at `+3`), `WINDOWS`/`STAGES`/`TEMPERATURES`/`DIFFICULTIES`/`SETS` (the one vocabulary shared by the charts, the `work/<n>` buckets, the review issues and the stats dashboard), ET date math, `workingDay()` (no scheduled date is ever a Sunday), `temperatureOf()` (days since a concept was last exercised → `hot`/`fresh`/`fading`/`cold`, bands derived from `WINDOWS` so they cannot drift; read-side only, nothing is scheduled off it), seeded sampling, `logAttempt()` (the ONE write path — email taps, webhook, gate scoring all converge here), and overload leveling: at most `REVIEW_CAP` (3) reviews surface per day — `levelReviews()` (run by `sendDigest` on real sends only, never dry) gives everything past the cap a concrete future WORKING day, ≤ 3 per day, oldest first, instead of letting the due pile grow.
- `apps/api/src/index.ts` — router + cron dispatch; `apps/api/wrangler.jsonc` — bindings (`DB`, `EMAIL`), crons, vars; secrets `GH_PAT`/`WEBHOOK_SECRET`/`LINK_KEY` via `wrangler secret put`, and `OPENROUTER_API_KEY`, whose one copy is the repo's Actions secret (deploy.yml puts it before every deploy — rotate it there).
- `apps/api/src/ask.ts` — `POST /ask`, the docs assistant's backend. Blume's own assistant route is server-rendered and cannot ship in the static Pages build (`BLUME_SERVER_FEATURE_REQUIRED`), so `blume.config.ts` sets `ai.assistant.endpoint` to this route instead of a `provider`. It speaks the Blume island's wire contract (`{ messages, page: { path } }` in, a plain-text stream out, a 503 "The assistant is not configured…" when the key is missing), validates like Blume's generated route (1–40 user/assistant messages, 24 000 chars, 64 KB — no caller system prompt), grounds on the published `llms-full.txt` (current page first, then keyword-ranked excerpts in Blume's 6 × 2 000 / 10 000-char budget, cached 5 min), and streams OpenRouter's chat completions over plain `fetch` — no AI SDK — for the `ASK_MODEL` var. `:free` models share an upstream pool and often answer 429, which the island shows as its rate-limit notice.
- `apps/api/src/digest.ts` / `apps/api/src/email.tsx` — the daily digest, split data/presentation. `digest.ts` reads D1 into a `DigestData`; `email.tsx` owns every colour and every sentence, and renders both the HTML and (via its own `plainDigest`, not React Email's `plainText` mode, which flattens the tables) the text alternative. The retrieval rules hold by construction: `DigestRow` has no title and no issue field, so a review or drill line *cannot* leak the topic or a solution link. Subject is `(Day N/<CAMPAIGN_DAYS>) LeetCode Daily Digest` — 79 with the plan ending Nov 3; booking a later day in `schedule.json` lengthens it, and the heatmaps and `/api/stats` `heat` with it.
- `apps/api/src/png.ts` — hand-rolled PNG encoder (RGB8, one IDAT, zlib via `CompressionStream("deflate")`, CRC32, 5×7 bitmap font). It exists because every major email client refuses remote SVG, so `/chart/heatmap.png` rasters the heatmap for the digest while `/chart/heatmap.svg` keeps serving the README byte-for-byte. Both come from one `heatmapCells()` so the two pictures cannot drift.
- `apps/cli/sync.ts` — work→docs contract: on existing pages only the frontmatter `icon:` and the `## Solution` section are regenerated, and `topics:` (LeetCode's `topicTags` as `{ name, slug }`, fetched by GraphQL) and `issue:` (the URL of the problem's `problem`-labelled GitHub issue, `LC <num> · …`, listed via `github()` — rendered as the neutral `Issue #N` badge after `Explanation`) are filled once — on create, or on any run that finds them missing — never refreshed (delete a key to refetch; offline or without `gh` auth, the page is written without it and the next sync retries; a sync with nothing missing makes no request). Only a problem the README plan lists gets `issue:` — an unplanned warm-up has no catalog issue, so it is never looked up. `## Solution` is the latter bounded by `solutionEnd()` at the next unfenced top-level heading; human prose before it and any sections after it are never touched. Never hand-write solution pages or edit inside `## Solution`. Two classifications, two homes: the sidebar group is the README topic (`readmeTopics()`, first listing wins for a problem under two topics; a warm-up outside the plan groups under its category at `order: 0`, ahead of topic 1) and the `work/1/<Difficulty>/<Category>/` category, which only places an unplanned problem — the page's topic badges are LeetCode's tags, not either classification. Topics nest under their README phase (`## Phase N — Name` headings, shortened via `PHASE_ALIASES`): `docs/(0N-<phase>)/<topic>/`, with every problem page in the topic's `(problems)/` group as `<num>_<slug>.mdx` (a page is found by its frontmatter title, wherever it sits, so a layout change is one sync of `rename`s). `docs/site.json` is wholly script-owned and rewritten whenever it differs, because `mdxRemote()` reads no `meta.ts`: its `folders` are what a `meta.ts` per phase and topic folder would carry — a phase `N. Name` at `order: N`, a topic its exact label, curriculum order, `TOPIC_ICONS` icon and `display: "page"` — all derived from the README, so a rename there is a rename on the site; its `redirects` are the `/<num>` → `/<topic>/<slug>` short links. Which tags the site teaches as topics (`topic-landings.ts`) and its Appendix glossary (`appendix.ts`) are the site's, in prdlk/cs: sync no longer checks them. The phase folder is a Blume `(group)` — no route segment, so `/tree-dfs` is unchanged and a landing page there is one level deep, never at `/` — and the topic folder is the real segment; never put a topic `index.mdx` directly inside a `(group)`. A page is `rename`d when its topic or phase changes; a folder every page has left is deleted (climbing through an emptied `(problems)` and topic into an emptied phase folder) unless it still holds a hand-written `index.mdx` (sync never writes, moves, or deletes one). Slugs come from `slugify()`, which glues a leading number to the next token (`1d-dynamic-programming`) because Blume strips `<digits>-` prefixes from routes. The hand-owned parts have their own owners: `## Approach` (a Mermaid flowchart tracing the page's code, placed *before* `## Solution` so a re-sync keeps it) is written per the `problem-approach` skill (`/problem-approach` fills every page missing one); the frontmatter `video:` (the NeetCode walkthrough, rendered as the red `Explanation` badge) is added by `bun run videos --write` (`apps/cli/videos.ts`).
- `apps/cli/work.ts` — the `work/` layout: bucket paths, `isSolution()`/`solvedInBucket()` (the stub test, shared with `close-solved.ts`), `firstSolved()` (one `git log`, ET dates, keyed by LC number so past layout moves don't matter), and `reviewQueues()` (what each window still owes). Everything that needs to know where a solution file lives, or when it was solved, goes through here.
- `apps/api/src/stats.ts` / `apps/cli/stats.ts` / `apps/cli/tui.ts` / `apps/cli/api.ts` — the read side. `buildStats()` is the ONE aggregation: phases, ladder, difficulty, `attempting` (open misses, via `MISS_WHERE` in `srs.ts` — the sweep day's definition), per-topic temperature, gates, the 14-day due queue, `heat` (every campaign day, zeros and future days included — the TUI windows its tail rather than asking a second question), `recent` (the ten problems most recently solved, dated by each one's first pass) and `year` (the 365 days ending today — always the calendar year to date — each split by difficulty into attempts and first solves; the docs cards window and bucket it themselves). Two readers consume it, the docs site's `/progress` islands (prdlk/cs `lib/stats.ts`) and `bun run stats`, so its shape is a cross-repo contract: change the Worker and both readers together (additive fields a reader ignores are safe). `tui.ts` is hand-rolled ANSI (bars, sparklines, heat cells, alternate screen) on charts.ts's palette, and every chart differs by GLYPH as well as by colour so a piped or `NO_COLOR` dashboard still reads. The TUI recomputes nothing: the only local fact it shows is the `work/` solution count, which is inventory, not schedule.
- `README.md` live charts are Worker endpoints (`/chart/*.svg`, `/badge/gate.svg`, 5-min Camo cache); the campaign table doubles as topic-map input to `sync.ts` (`readmeTopics()`, `TOPIC_ALIASES`, `PHASE_ALIASES`). `/api/stats` and `/ask` reflect a requesting origin only when it is in the `DOCS_ORIGIN` var (`apps/api/wrangler.jsonc`, comma-separated: `https://lc.prd.lk,https://prdlk.github.io`) — a new host for the docs site must be added there.
- Old `.github/srs/` JSON state, its `srs-*` Actions, and the one-shot `import-srs.ts` importer are RETIRED and deleted — do not resurrect; git history is the record.
## Runtime/Tooling Preferences
- **Bun only**: run scripts with `bun apps/cli/<name>.ts` (or the root `bun run` aliases), install with `bun install --frozen-lockfile`. One workspace (`apps/*`), one root `bun.lock`.
- **Near-zero runtime npm dependencies** — SVG, PNG, terminal ANSI, HMAC (WebCrypto), GraphQL are hand-rolled; Actions scripts use Bun builtins + `fetch` only. One exception, confined to one surface: the digest email, `apps/api/src/email.tsx`, renders React Email (`react`, `react-dom`, `@react-email/components`, `@react-email/render`) inside the Worker, because hand-rolling table-based email HTML that survives Gmail *and* Outlook is not worth owning. It costs ~235 KB gzipped of a 3 MB budget, needs no `nodejs_compat` (it resolves to `renderToReadableStream`), and requires `"jsx": "react-jsx"` in `apps/api/tsconfig.json`. Do not extend it to any other module. (The docs site's own dependencies are prdlk/cs's.)
- Local GitHub auth falls back to `gh auth token`; scripts run fine outside Actions.
## Testing & QA
- Repo-wide: no test framework — `bun run test` submits one solution to LeetCode's judge. Exception: `apps/api/src/srs.test.ts` (`bun:test`) proves the DST cron guards with fixed dates; run via `bun run api:test`.
- QA is dry-runs + local state: Worker logic against `wrangler dev` + local D1 with `?dry=1&date=`; reconcilers with `--dry-run`; idempotency check = run twice, `cmp` output.
- Docs changes: the site builds in prdlk/cs, which must pass `bunx blume build --isolated` with no new warnings against this repo's `docs/`; after sync, review only *created* pages (prose transforms are heuristic) and `docs/site.json`'s diff.