--- title: 'Week 6' description: 'Calibration onsites. Coding drops to maintenance. Mock #4 is the gate.' sidebar: icon: target --- **September 21–27, 2026.** Run the calibration onsites. Move coding to maintenance. Pass the Mock #4 gate. This is the week that counts. Do not arrive tired. ## Goals - [ ] Move coding to maintenance, about 2 hours each day. - [ ] Run the calibration onsites and absorb the feedback. - [ ] Pass Mock #4: score "strong hire" twice in a row. - [ ] Finish bug-squash drill 3. :::note[Schedule shift] Coding drops to about 2 hours each day. Merge the A-set and the B-set into one timed block. Spend the rest of the day on the onsites, the mock, and the pipeline. ::: ## Daily schedule | Day | Coding — about 2h | System design — B4 | Pipeline | |---|---|---|---| | Mon | 2 timed Robinhood-tagged problems + all due B-set | Reverse-design rehearsal: defend webhooks against pub/sub, caching, and the database | Schedule the Robinhood onsite | | Tue | 2 timed mixed problems + B-set | **Mock #4** — the gate | Ramp onsite | | Wed | Speed drill: 2 mediums in 35 minutes | Polish the weakest 2 stories | Robinhood onsite | | Thu | 2 timed Coinbase-tagged problems + B-set | Stripe API-design drill: versioning, partial failure, and idempotent retries | Brex values round | | Fri | Gate day. | Bug-squash drill 3: Stripe format, about 200 lines, 5 to 7 bugs | Stripe, Plaid, and Circle screens | | Sat | 2 timed mixed problems. Spot-check 3 green concepts. | Targeted reps from the onsite feedback | Confirm week 7: Stripe, Plaid, Circle, and Coinbase (Friday) | ## Friday gate :::warning[Gate] Score Mock #4 at "strong hire" twice in a row, counting Mock #3. Finish the calibration onsites. Absorb the feedback. Do not start the top-target onsites until you pass. ::: :::danger[Coinbase last] Keep Coinbase last. Confirm the Coinbase onsite for Friday of week 7. ::: ## Outputs - The calibration onsites, done, with feedback absorbed. - Mock #4 passed at "strong hire" twice in a row. - Bug-squash drill 3, done.