--- title: 'Week 3' description: 'Trees, heaps, and tries. Run the first scored mock. Open Track B and the pipeline.' sidebar: icon: git-branch --- **August 31 – September 6, 2026.** Finish trees. Add heaps and tries. Run the first scored system-design mock. Open Track B and the pipeline. ## Goals - [ ] Finish trees. Learn heaps and tries. - [ ] Run Mock #1 (premium, scored). Reach "lean hire" or better. - [ ] Build the Stripe test-mode integration. - [ ] Send 10 investor emails and 6 applications. ## Daily schedule | Day | Concept — B1 (untimed) | Timed problems — B2 and B-set | Track B — B4 | Behavioral and pipeline — B5 | |---|---|---|---|---| | Mon | Trees: BST patterns | Subtree of Another Tree, Lowest Common Ancestor, Binary Tree Level Order, Right Side View, Count Good Nodes (5) + B-set | — | Send 10 investor emails | | Tue | Trees: hard patterns | Validate BST, Kth Smallest in BST, Construct Tree from Preorder and Inorder (3) + B-set | **Mock #1** (premium) | Apply to Kraken | | Wed | Heap (5 walkthroughs) | Kth Largest in a Stream, Last Stone Weight, K Closest Points, Kth Largest in an Array (4) + B-set | Build the Mock #1 fix list. Run a patch drill. | Apply to Anchorage, Paxos, and Brex | | Thu | Heap depth and trie (2 walkthroughs) | Task Scheduler, Find Median from Data Stream; Implement Trie, Word Search II (intro) (4) + B-set | Track B 1: Stripe test-mode integration — payment intent, webhook, and idempotency | Apply to Ramp | | Fri | Gate day. Do no new lesson. | 2 random mediums, plus review the Mock #1 result. | Review the gate result. | Write story 6: W3C and MIT influence | | Sat | Buffer: redo red concepts | B-set catch-up: all due and overdue problems | Record all stories out loud, 90 seconds each | Apply to Robinhood | ## Daily blocks Use the same 10-hour day as [Week 1](/schedule/week-1). Keep Sunday off. :::tip Book premium mocks in advance. Slots fill early. ::: ## Friday gate :::warning[Gate] Score Mock #1 at "lean hire" or better. Solve 2 random mediums at 8/10 or more. If you do not pass, repeat the week. ::: ## Outputs - 16 A-set problems, timed. - A heavy B-set week. - Mock #1, scored, with a written fix list. - The Stripe test-mode integration. - 6 applications and 10 investor emails.